Easily add and delete equipment for your project.

SnipImage.jpg

Building Equipment Schedule                          

panel.vector.orange_copy-1.jpgBuilding Equipment Schedule(s) organize the electrical load requirements for equipment such as HVAC equipment, elevators, fire and other pumps and more in the project. A separate schedule is required for each piece of equipment used in the project, then an electrical NODE is activated connecting the schedule to the power distribution system.

Matching existing conditions, PowerCalc automatically calculates, and re-calculates for changes, the electrical requirements for the building equipment listed on each schedule. The User can override the automatic calculations for specific project and design requirements.

These schedules display relevant and standard industry information in a format for ready identification.