Easily add and delete equipment for your project.
Building Equipment Schedule
Building Equipment Schedule(s) organize the electrical load requirements for equipment such as HVAC equipment, elevators, fire and other pumps and more in the project. A separate schedule is required for each piece of equipment used in the project, then an electrical NODE is activated connecting the schedule to the power distribution system.
Matching existing conditions, PowerCalc automatically calculates, and re-calculates for changes, the electrical requirements for the building equipment listed on each schedule. The User can override the automatic calculations for specific project and design requirements.
These schedules display relevant and standard industry information in a format for ready identification.
488 N. Federal Hwy, Boynton Beach, Florida 33435
(561) 278-9969
Inbound Performance Template by SmartBug Media. Copyright 2025.
All Rights Reserved